Wheeeeeeeeeeeee!

It came off the assembly line last night, and is now awaiting shipment. This is the longest bit. It must be loaded onto a truck and driven to a port. Transatlantic shipping via cargo container will take a while. Another truck ride to the prep facility in SC. Then it will undergo final prep at the previously mentioned BMW South Carolina facility. Finally, it will once again be loaded on to a truck and driven to BMW of Fairfax, at which point I expect they'll call me and tell them to come pick it up. And write them a check. Can't forget the check. They're funny like that.
This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting
.

Most Popular Tags

Powered by Dreamwidth Studios

Style Credit

Expand Cut Tags

No cut tags